Monday, April 07, 2025 | 287 reads | 0 comments | 0 shares
RDMP Balikpapan JO Available Job Vacancies
-
Electrical Supervisor
-
Instrument Engineer
-
QC Piping Inspector
recruitment@rdmpbpnjo.co.id
Subject: Name_Job Position_Domicile Example: Angga Maulana Saputra_Electrical Supervisor_Balikpapan
Share this information if you know someone interested in these positions.
INSTRUMENT ENGINEER
REQUIREMENT
- At least 5 years experience as Instrument Engineer (Pre-comm,Commissioning, Function Test, etc)
- Majoring in Engineering (Diploma/Bachelor)
- Good analysis and problem- solving
- Have a good communication skill
JOB RESPONSIBILITIES
- Instrument test (SAT, Loop Test, Function Test)
- Coordination with multiple parties for instrument activities
- Prepare and update report
ELECTRICAL SUPERVISOR
REQUIREMENT
- Majoring in Electrical Engineering (High School/Diploma/Bachelor)
- At least 3 years experience as Electrical Supervisor
- Good analysis and problem- solving
- Have a good communication skill
JOB RESPONSIBILITIES
- Supervise equipment installation
- Coordination with 2 multiple parties for electrical activities
- 3 Prepare and update report of site equipment installation activities
QC PIPING INSPECTOR
REQUIREMENT
- Majoring in Engineering (Diploma/Bachelor)
- At least 2 years experience as QC Piping Inspector
- Certified as Welding Inspector (AWS, B4T, BNSP, CSWIP or equivalent)
- Have a good communication skill
JOB RESPONSIBILITIES
- Walk-through, punch and hydrotest inspection
- Coordination with multiple parties for quality activities
- Prepare and update report
Please submit your CV to recruitment@rdmpbpnjo.co.id
Subject: QC Piping Inspector_name_domicile
- Di iklankan: 2025-04-07 20:42:05 - Standar Waktu Asia Tenggara
- Berakhir: 2025-04-21 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2020
| Daerah |
Sektor |
Nominal (Rp.) |
| KALTIM |
UMUM |
2.981.378,72 |
| BALIKPAPAN |
UMUM |
3.069.315,66 |
| BERAU |
UMUM |
3.386.593,23 |
| BONTANG |
UMUM |
3.182.706,00 |
| KUBAR |
UMUM |
3.309.555,00 |
| KUKAR |
UMUM |
3.179.673,00 |
| KUTIM |
UMUM |
3.140.098,00 |
| PASER |
UMUM |
3.025.172,00 |
| PPU |
UMUM |
3.363.809,79 |
| SAMARINDA |
UMUM |
3.112.156,40 |